Research Article

Analyzing the Diverging Diamond Interchange Using Discrete Event Simulation

Table 5

Results for Runs2–5—average times through DDI.

Vehicle RouteAverage delay through DDI (minutes)
Run1Run2Run3Run4Run5

S to N0.670.550.641.094.77
S to E0.000.000.000.000.00
S to W0.470.330.200.410.73
N to S0.540.540.581.147.21
N to W0.000.000.000.000.00
N to E0.470.330.180.400.73
W to S0.000.000.000.000.00
W to N0.440.350.430.744.06
W to W0.000.000.000.000.00
E to N0.000.000.000.000.00
E to S0.440.340.400.816.50
E to E0.000.000.000.000.00