A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory
Table 1
Severity evaluation criteria.
| Effect | Ranking | Criteria: severity of effect |
| Hazardous without warning | 10 | A potential failure mode endangers operator, machine, or assembly without warning. | Hazardous with warning | 9 | A potential failure mode endangers operator, machine, or assembly with warning. | Very high | 8 | Machine produced Lead defects greater than 4 hours. | High | 7 | Machine produced Lead defects between 2 hours and 4 hours. | Moderate | 6 | Machine produced Lead defects between 1 hour and 2 hours. | Low | 5 | Machine produced Lead defects between half an hour and 1 hour. | Very low | 4 | Machine produced Lead defects between 10 minutes and half an hour. | Minor | 3 | Machine produced Lead defects less than 10 minutes. | Very minor | 2 | Critical machine parameter was out of specification limits but needs to adjust during operation. | None | 1 | Critical machine parameter was out of specification limits and may adjust during preventive maintenance. |
|
|