Lower bound setting for each component.
| Component | Current PM interval | Lower bound | Minimum time-to-failure value | Converted to cycles | Months | Cycles |
| () Test socket | 25,871 | 3.59 | 3 | 21,600 | () Inserter | 25,612 | 3.55 | 3 | 21,600 | () Lead pusher | 30,612 | 4.25 | 4 | 28,800 | () Linear guide | 45,871 | 6.37 | 6 | 43,200 | () Vacuum pad | 18,251 | 2.53 | 2 | 14,400 | () Picker cylinder | 45,783 | 6.35 | 6 | 43,200 | () Ejector filter | 27,781 | 3.85 | 3 | 21,600 | () Solenoid valve | 55,432 | 7.69 | 7 | 50,400 | () Timing belt | 54,582 | 7.58 | 7 | 50,400 |
|
|