|
| Starting time of the F&B procedure (s)
|
| Case 1 600 s | Case 2 3000 s | Case 3 5100 s | Case 4 5700 s |
|
| Main FW turbo-pumps stop | 50 | 50 | 50 | 50 |
| Turbine and reactor stop | 50 | 50 | 50 | 50 |
| Manual action: RCP stop | 350 | 350 | 350 | 350 |
| 2 out of 3 SG wide range level reach 6% | 1782 | 1782 | 1782 | 1782 |
| Manual action: PORV is opened | 2382 | 4782 | 6882 | 7482 |
| Manual action: HPIS is actuated | 2382 | 4782 | 6882 | 7482 |
| Clad maximum temperature is reached (clad maximum temperature) | 48 (622 K) | 4220 (628 K) | 7240 (1460 K) | 7610 (1652 K) |
| Transient end | 13000 | 13000 | 13000 | 13000 |
|