Science and Technology of Nuclear Installations
Volume 2008 (2008), Article ID 458316, 11 pages
doi:10.1155/2008/458316
Research Article

Effect of Coolant Inventories and Parallel Loop Interconnections on the Natural Circulation in Various Heat Transport Systems of a Nuclear Power Plant during Station Blackout

1Reactor Safety Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085, India
2Reactor Engineering Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085, India
3Chemical Engineering Department, Indian Institute of Technology (IIT), Powai, Mumbai 400076, India
4Mechanical Engineering Department, Indian Institute of Technology (IIT), Powai, Mumbai 400076, India
5Nuclear Power Corporation of India (NPCIL), NUB, Anushaktinagar, Mumbai 400094, India

Received 21 June 2007; Accepted 25 January 2008

Academic Editor: Dilip Saha

Copyright © 2008 Avinash J. Gaikwad et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. M. Misale, M. Frogheri, F. D'Auria, E. Fontani, and A. Garcia, “Analysis of single-phase natural circulation experiments by system codes,” International Journal of Thermal Sciences, vol. 38, no. 11, pp. 977–983, 1999. View at Publisher · View at Google Scholar
  2. S. K. Mousavian, M. Misale, F. D'Auria, and M. A. Salehi, “Transient and stability analysis in single-phase natural circulation,” Annals of Nuclear Energy, vol. 31, no. 10, pp. 1177–1198, 2004. View at Publisher · View at Google Scholar
  3. M. R. Gartia, D. S. Pilkhwal, P. K. Vijayan, and D. Saha, “Analysis of metastable regimes in a parallel channel single phase natural circulation system with RELAP5/MOD3.2,” International Journal of Thermal Sciences, vol. 46, no. 10, pp. 1064–1074, 2007. View at Publisher · View at Google Scholar
  4. T.-J. Liu, C.-H. Lee, and Y.-S. Way, “IIST and LSTF counterpart test on PWR station blackout transient,” Nuclear Engineering and Design, vol. 167, no. 3, pp. 357–373, 1997. View at Publisher · View at Google Scholar
  5. Z. Xinian, G. Weijun, H. Bing, and S. Shifei, “Transient analyses of the passive residual heat removal system,” Nuclear Engineering and Design, vol. 206, no. 1, pp. 105–111, 2001. View at Publisher · View at Google Scholar
  6. W. Tian, S. Qiu, G. Su, D. Jia, X. Liu, and J. Zhang, “Thermohydraulic and safety analysis on China advanced research reactor under station blackout accident,” Annals of Nuclear Energy, vol. 34, no. 4, pp. 288–296, 2007. View at Publisher · View at Google Scholar
  7. N. Muellner, M. Cherubini, W. Krompa, F. D'Auria, G. Petrangeli, and first-name middle-name last-name, “A procedure to optimize the timing of operator actions of accident management procedures,” Nuclear Engineering and Design, vol. 237, no. 22, pp. 2151–2156, 2007. View at Publisher · View at Google Scholar
  8. M. Pavlova, P. Groudev, V. Hadjiev, and J. Roglans, “RELAP5/MOD3.2 analysis of natural circulation test at Kozloduy NPP unit 6,” in Proceedings of the 5th International Informational Exchange Forum, pp. 1–12, Obninsk, Russia, October 2000.
  9. A. J. Gaikwad, R. Kumar, S. F. Vhora, G. Chakraborty, and V. V. Raj, “Transient analysis following tripping of a primary circulating pump for 500 MWe PHWR power plant,” IEEE Transactions on Nuclear Science, vol. 50, no. 2, pp. 288–293, 2003. View at Publisher · View at Google Scholar
  10. R. Kumar, A. J. Gaikwad, S. F. Vhora, G. Chakraborty, and V. V. Raj, “Logic modification to avoid ECCS lineup in the PHT system during thermal shrinkage transients of 220 MWe PHWR nuclear power plant,” IEEE Transactions on Nuclear Science, vol. 50, no. 4, pp. 1229–1237, 2003. View at Publisher · View at Google Scholar
  11. A. J. Gaikwad, R. Kumar, S. F. Vhora, G. Chakraborty, and V. V. Raj, “Selection of a steam generator pressure control program for a 500 MWe pressurized heavy water reactor power plant through transient analysis,” Proceedings of the I MECH E Part A Journal of Power and Energy, vol. 217, no. 6, pp. 631–642, 2003.
  12. A. J. Gaikwad, R. Kumar, G. Chakraborty, et al., “Performance analysis of the primary and the secondary pressure control systems of a 540 MWe PHWR power plant,” in Proceedings of the 11th International Topical Meeting on Nuclear Reactor Thermal-Hydraulics (NURETH-11) Popes' Palace Conference Center, Avignon, France, October 2005.
  13. A. D. Contractor, A. J. Gaikwad, R. Kumar, and G. Chakraborty, “Process control logic modification to mitigate transient following tripping of a primary circulating pump for a 540 MWe PHWR power plant,” in Proceedings of International Congress on Advances in Nuclear Power Plants (ICAPP '06), pp. 1187–1193, Reno, Nev, USA, June 2006.
  14. NPCIL Document: TAPP-3,4 Safety Report Volume-II.
  15. NPCIL Document: Design Basis Report on KAPP-3,4 (700 MWe Project) Passive Decay Heat Removal System (draft).
  16. The RELAP5 Development Team, August 1995, RELAP5/MOD3.2 Code Manual, NUREG/CR-5535, INEL-95/0174, Vol.1.