Research Article

Converting Maturing Nuclear Sites to Integrated Power Production Islands

Figure 3

Conversion from two thermal to six fast spectrum plants (BR = 1.3).
519538.fig.003a
(a) Nonprocessed fuel inventory (BR = 1.3)
519538.fig.003b
(b) TRU fuel inventory (BR = 1.3)
519538.fig.003c
(c) TRU fuel reservoir (BR = 1.3 then reduced to 0.91)
519538.fig.003d
(d) Reprocessing rates (BR = 1.3 then reduced to 0.91)