(a)
Nonprocessed fuel
(b)
Reprocessing rate
(c)
TRU fuel reservoir
(d)
Increased processing rate of 103 MT/yr
Figure 5:
Conversion to four thermal, two fast spectrum plants (BR = 0.5, increased to 0.55 and then 0.5).