Table 2

Control logic of Test 6-1 [7].

Event Condition

Break Time zero
Generation of scram signal Primary pressure 84% of initial value
PZR heater off Generation of scram signal or PZR liquid level below 2.3 m
Initiation of core power decay curve simulation
Initiation of primary coolant pump coastdown
Turbine trip (closure of stop valve)Generation of scram signal
Closure of main steam isolation valve
Termination of main feedwater
Opening and closing of the SG relief valves SG pressures 110%/103%
Generation of SI signal Primary pressure below 79% of initial value
Initiation of auxiliary feedwater Generation of SI signal
Initiation of SG secondary-side depressurization as accident management (AM) action by fully opening relief valvesCore exit temperature reaches 623 K
Initiation of accumulator system Primary pressure below 29% of initial value
Initiation of LPSI system LP pressure below 8% of initial value