Research Article
Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility
Table 5
Chronology of the main events in Test 6-2 [
7].
| Event | Exp. | TRACE |
| Break valve opened | 0 | 0 | Scram signal | 569 | 453 | SI signal | 736 | 545 | Primary coolant pumps stopped | 819 | 708 | Asymmetrical SG secondary-side depressurization | 2548 | 2345 | Closure of SG RV in loop with PZR | 2679 | 2345 | Initiation of accumulator system | ≈5150 | 5450 | Inflow of nitrogen gas from Acc, loop with PZR | ≈10030 | 10995 | Inflow of nitrogen gas from Acc, loop w/o PZR | ≈11070 | 11013 | Core uncovery | ≈20400 | 22370 | Initiation of LPSI | ≈21940 | — | Core protection activated | ≈23270 | 23510 | Second actuation of LPSI system | ≈23320 | — | End of transient | 24034 | 24000 |
|
|