Research Article

Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility

Table 5

Chronology of the main events in Test 6-2 [7].

Event Exp. TRACE

Break valve opened 0 0
Scram signal 569 453
SI signal 736 545
Primary coolant pumps stopped 819 708
Asymmetrical SG secondary-side depressurization 2548 2345
Closure of SG RV in loop with PZR 2679 2345
Initiation of accumulator system5150 5450
Inflow of nitrogen gas from Acc, loop with PZR10030 10995
Inflow of nitrogen gas from Acc, loop w/o PZR11070 11013
Core uncovery20400 22370
Initiation of LPSI21940
Core protection activated23270 23510
Second actuation of LPSI system23320
End of transient 24034 24000