Research Article

Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility

Table 8

Control logic of Test 2 [13].

EventCondition

BreakTime zero
Generation of scram signalPrimary pressure 84% of initial value
PZR heater offGeneration of scram signal or PZR liquid level below 2.3 m
Initiation of core power decay curve simulation
Initiation of primary coolant pump coastdown
Turbine trip (closure of stop valve)Generation of scram signal
Closure of main steam isolation valve
Termination of main feedwater
Generation of SI signalPrimary pressure below 79% of initial value
Initiation of HPIS in the loop with PZR only12 s after SI signal
Initiation of accumulator systemPrimary pressure below 29% of initial value
Initiation of low-pressure injection systemLP pressure below 8% of initial value
Opening and closing of the SG relief valvesSG pressures 110%/103%