Chronology of the main events in Test 2 [13].

EventExp.TRACE

Onset of break 0 0
Scram signal 5 6
SI signal 7 9
Turbine trip and MSIVs closed 10 9
Primary pumps trip 11 6
Termination of SG FW 13 6
SG relief valves open27–5725–55
Initiation of core power decay 29 24
Initiation of HPSI35 21
Loop seal clearing4060
Primary pressure lower than SG pressure55 74
Initiation of Acc system110 126
Core protection activated140
Max. PCT150 141
Whole core was quenched180 212
Primary coolant pumps stopped 260 256
Termination of Acc injection280285
Initiation of LPSI290
End of test 1212 500