LOBI test facility design and operational parameters.

Reference plantSiemens-KWUBiblis B
Loops4
Power1300 MWe

Primary systemLoops2 (1 : 3)
Total volume0.6 m³
Scaling factor1 : 700

CorePower5.28 MWe
Length3.9 m
Number of rods64
Matrix8 × 8 square
Heater rod OD10.75 mm
Pitch14.3 mm
Electrical heatingDirect

Vessel downcomerConfigurationAnnular
Gap widthMOD1: 50 and 12 mm
MOD2: 12 mm

Steam generatorsTypeU-Tubes
Number of tubes1-Loop SG: 8
3-Loop SG: 24

Main coolant pumpsTypeCentrifugal
Specific speed (DIN)29.2

Operational conditionsPrimary system pressure15.8 MPa
Core temperatures294/326°C inlet/outlet
Secondary system pressure6.4 MPa
SG temperatures210/280°C inlet/outlet