Research Article
Major Achievements and Prospect of the ATLAS Integral Effect Tests
Table 7
Test matrix for SLB tests.
| Test ID | Break size | Test conditions |
| SLB-GB-01 | Guillotine break | 100% rated condition with LOOP | SLB-GB-02 | Guillotine break | 8% power condition without LOOP | SLB-GB-03 | Guillotine break | 8% power condition with LOOP | SLB-PB-01 | 20% partial beak | 100% rated condition with LOOP | SLB-PB-02 | 20% partial beak | 8% power condition without LOOP | SLB-PB-03 | 20% partial beak | 8% power condition with LOOP |
|
|
*LOOP: Loss of Offsite Power.
|