Consistent Posttest Calculations for LOCA Scenarios in LOBI Integral Facility
Table 4
Resulting sequence of events, comparison between experimental test and calculated results of A1-84.
| Events/set points | Time after experiment initiation (s) | Calculated time after transient initiation (s) |
| Break opening | 0.0 | 0.0 | SCRAM signal (at 13.2 MPa + delay 0.5 s) | 1.0 | 1.0 | Secondary side cooldown 100 K/h actuation (at 13.2 MPa + 1.5 s valve closure time) | 1.3 | 13.0 (imposed by time) | Pressure in PS 11.7 MPa | 5.0 | 4.76 | MCPs start coastdown (at 11.0 MPa + delay 1.0 s) | 7.0 | 7.0 | Upper plenum in saturation conditions | 15.8 | 19.3 | HPIS actuation (at 11.7 MPa + delay 35 s) | 40.0 | 39.76 | PS pressure falls below SS pressure IL/BL | 90.8/97.8 | 101.3/101.83 | Occurrence of minimum primary side mass | 347.4 | 350.0 | Accumulator actuation IL/BL (at 2.8 MPa, disabled at 11 Mpa + delay 500 s in cold leg, not disabled in hot leg) | 347.0/349.9 | 335.1/335.0 | Auxiliary feedwater in broken loop | — | — | Accumulator injection stops Cold leg IL/BL | 509.0/520.0 | 487.4/558.7 | Accumulator injection stops Hot leg IL | 849.0 | 849.0 | End of the test (0.1 Mpa) | 850.0 | 850.0 |
|
|