Review Article
Station Black-Out Analysis with MELCOR 1.8.6 Code for Atucha 2
Nuclear Power Plant
Table 2
CNA-2 PHWR NPP versus German PWR—timing of events in an SBO.
| Plant characteristic | CNA-2 PHWR low pressure SBO MELCOR | Ref. German PWR KONVOI low pressure SBO MELCOR |
| Core thermal power (MW) (total) | 2160 | 3765 | Core decay power (MW) at reactor scram | 129.6 | 241.9 | Total volume of primary system (m3) | 520 | 415 | Primary system volume to core power ratio (m3/MW) | 0.241 | 0.110 |
| Event listed for CNA-2 PHWR/Event listed for PWR | Time (h:m) | Time (h:m) |
| SG dryout | ~2:00 | 0:57 | PRZ SV failure stuck open | 2:31 | — | Start of uncovery of core/moderator tank | 3:00/3:00 | ~2:10/— | Total uncovery of core/moderator tank | 3:30/9:00 | ~4:30/— | Gap release from fuel | 3:56 | 2:22 | Beginning of core channel failure (PHWR), respectively Core failure and debris formation (PWR) | 5:16 | 2:35 | Failure of surge line due to creep rupture followed by accumulator injection | — | 2:55 | Fuel relocation to moderator tank bottom (PHWR) Molten pool formation in core (PWR) | >5:30 | >4 h | Failure of moderator tank bottom (PHWR)/core support plate (PWR) and debris relocation to lower head | 11:17 | 5:02 | RPV failure | 23:45 | 6:22 |
|
|