Research Article

Preliminary Assessment of the Possible BWR Core/Vessel Damage States for Fukushima Daiichi Station Blackout Scenarios Using RELAP/SCDAPSIM

Figure 34

Maximum bundle temperature, water level, and reactor vessel pressure for scenarios without water injection and with water injection at 4.9 hours after scram (all emergency water injection was terminated at 4.2 hours after reactor scram).
646327.fig.0034