Research Article

CATHARE Assessment of Natural Circulation in the PKL Test Facility during Asymmetric Cooldown Transients

Table 4

Main events for PKL2 G2.1 Run-2.

Time [s]Measures/Events

0Start of Run-2. Continuous cooldown initiated: continuous cooldown at 50°C/h by SG-2 and SG-4
80PRZ heater switched off
2240Spraying in PRZ by volume control system switched on (positive subcooling in the SGU-tubes is maintained)
6140Flow stagnation in loop-1
7310End of Run-2