Research Article
Qualification of TRACE V5.0 Code against Fast Cooldown Transient in the PKL-III Integral Test Facility
Table 2
Post test: resulting sequence of main events.
| # | Event description | EXP (sec) | GRNSPG UNIPI TRACE5 | Note |
| 1 | Start of transient (break opening) in SG number 1 steam line | 0 | 0 | Imposed | 2 | Heaters in SG number 1 switched off | 0 | 0 | Imposed | 3 | Trip of the MCP and coastdown | 0 | 0 | Imposed | 4 | PRZ heaters switched off | 0 | 0 | Imposed | 5 | Butterfly valves closure | 210 | 210 | Imposed | 6 | MCPs completely stopped | 210 | 210 | Imposed | 7 | Affected SG level lower than <8.0 m | 6.4 | 9 | | 8 | Affected SG level lower than <5.0 m | 32 | 175 | | 9 | Affected SG level lower than <2.5 m | 393 | 422 | | 10 | Affected SG level lower than <1.0 m | 579 | 612 | | 11 | Affected SG level lower than <0.1 m (emptied) | 828 | 819 | | 12 | Affected SG pressure lower than <3.0 MPa | 10.4 | 10 | | 13 | Affected SG pressure lower than <2.0 MPa | 47 | 49 | | 14 | Affected SG pressure lower than <1.0 MPa | 164 | 177 | | 15 | Affected SG pressure lower than <0.5 MPa | 435 | 404 | | 16 | Minimum PRZ level | 819 | 806 | | 17 | Minimum mass flow rate in loop 2 to 4 | 1060 | NA | | 18 | Minimum coolant temperature in CL number 1 (phase 1) | 525–565 | 608 | | 19 | Minimum core inlet temperature (phase 1) | 780–840 | 867 | | 20 | HPIS activated in loops number 1 and number 4 (0.2 kg/s) | 1030 | 1030 | Imposed | 21 | Maximum temperature difference across SG number 1 (phase 1) | 380–420 | 369 | | 22 | PRZ safety valve 1st opening (steam released) | 1420 | 1378 | Steam discharged | 23 | Water released through the PRZ safety valve | 1840 | 1887 | | 24 | End of calculation | 4410 | 4410 | |
|
|