Research Article

Systems Thinking Safety Analysis: Nuclear Security Assessment of Physical Protection System in Nuclear Power Plants

Table 4

List of numeric values.

Path for sabotageValue (minute)

Pass of fence(Random number between 0 and 1) * 2
Pass of outer door(Random number between 0 and 1, mean: 0.8, and st. deviation: 0.2) * 10 + pass of fence
Pass of wall(Random number between 0 and 1, mean: 0.6, and st. deviation: 0.3) * 30 + pass of outer door
Pass of inner door(Random number between 0 and 1, mean: 0.4, and st. deviation: 0.3) * 60 + pass of wall
Attack of target(Random number between 0 and 1, mean: 0.2, and st. deviation: 0.1) * 90 + pass of inner door