Research Article

Assembly and Irradiation Modeling of Residual Stresses in Low-Enriched Uranium Foil-Based Annular Targets for Molybdenum-99 Production

Figure 5

(a) Hydroforming test rig with annular target in place. (b) Assembled hydroforming test rig.
673535.fig.005a
(a)
673535.fig.005b
(b)