Records related to the operation of the IC and venting in Unit 1.

DateTimeEvent

March 112:46 pmEarthquake, loss of offsite power, reactor trip, and IC autostart
Fast cooldown (>55°C/hr) and operator closed MO-3A, 3B
Control (open/close) of MO-3A (3 times before tsunami)
3:42 pmTsunami and SBO (operator unable to remember valve position)
6:18 pmTemporary restoration of DC power
MO-2A, 3A closed open (confirmed with indication)
6:25 pmMO-3A closed (unable to observe steam, fear of water depletion)
No report to emergency response center
8:07 pmRPV pressure (in the field) = 6.9 MPa
9:30 pmTemporary restoration of DC power
MO-3A open (steam generation confirmed)
11:50 pmBattery connection to D/W pressure gauge (600 kPa)

March 122:30 amD/W pressure = 840 kPa ( = 528.3 kPa)
3:45 amRepeated confirmation of vent operation
5:46 amStarted to pump fresh water through fire pumps to the RPV
8:27 amConfirmed that evacuation is not complete
8:37 amInformed Prefectural Government of venting at 9:00 am
9:03 amConfirmed that evacuation is complete