Review Article

Insights on Accident Information and System Operations during Fukushima Events

Table 3

Records related to manual trip of HPCI in Unit 3.

DateTimeEvent

March 114:04 pmRCIC manual start (operator confirmed low reactor water level)

March 1211:36 amRCIC trip. Unable to restart
12:35 pmHPCI autostart
Operators pay attention to reactor level, HPCI flow
8:36 pmDepletion of battery. Loss of reactor level indicator

March 132:42 amHPCI outlet pressure close to reactor pressure (0.8-0.9 MPa)
Plan to depressurize reactor using SRV (to 0.61 MPa)
HPCI manual trip
2:45 amFailure in SRV remote open (possibility that battery power low)
5:00 amReactor pressure = 7.38 MPa
7:00 amCar batteries connected to SRV
8:41 amVenting line-up (except rupture disk) complete