Research Article

Effect of Flow Blockage on the Coolability during Reflood in a 2 2 Rod Bundle

Table 4

Quench time at the upstream and downstream region of blockage.

(cm/s)TestUpstream (600 mm)Downstream (1190 mm)
1.0 kW/m1.5 kW/m1.0 kW/m1.5 kW/m

1.0Non-blockage231.6261.5401.9483.4
90% blockage237.7313.4332.7497.0

1.5Non-blockage203.9231.4340.5404.4
90% blockage208.3278.7262.2404.6

2.0Non-blockage186.3211.6303.5363.1
90% blockage188.3252.2235.7334.7

2.5Non-blockage171.5196.5276.2335.4
90% blockage168.6203.7219.9279.5

3.5Non-blockage147.7161.3243.0290.7
90% blockage137.5158.3198.8249.2