Research Article
Containment Depressurization Capabilities of Filtered Venting System in 1000 MWe PWR with Large Dry Containment
Table 4
LBLOCA sequence of event.
| Event summary | No CFVS | CFVS @ 0.9 MPa | CFVS @ 0.5 MPa |
| Cold leg LBLOCA occurs Rx Scram No CTMT spray/aux feed available | 0.0 sec | | | PZR empty | 7.0 sec | | | Core uncovery | 8.0 sec | | | Accumulator empty | 41.0 sec | | | Relocation to lower head | 1.4 Hrs | | | Vessel failure | 2.4 Hrs | | | CFVS opening/closing | | 28 Hrs/30.3 Hrs 88.1 Hrs/90.2 Hrs 151.8 Hrs/153.8 Hrs | 4.4 Hrs/14.0 Hrs 68.0 Hrs/73.3 Hrs 137.5 Hrs/141.9 Hrs | Containment failure | 53.8 Hrs | No fail | No fail | Calc. end | 168 Hr | | |
|
|