Research Article
Delayed Station Blackout Event and Nuclear Safety
Table 2
Initiating events.
| Initiating event | IE | All loss of coolant accidents | LOCA | Anticipated transients without scram | ATWS | Loss of main feedwater | LOFW | Turbine trip | TUT | Loss of direct current bus | LODC | Steam generator tube rupture | SGTR | Loss of off-site power | LOOP | Station blackout | SBO |
|
|