Research Article
An Improved Shuffled Frog Leaping Algorithm for Assembly Sequence Planning of Remote Handling Maintenance in Radioactive Environment
Table 3
Comparison test results of the algorithm.
| Parameter | GA | SFLA | AMPSO | PSO | SFLA–GA |
| Population size | 60 | 240 | 60 | 240 | 60 | 240 | 60 | 240 | 60 | 240 | Iteration times | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | 600 | Execution times | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | Feasible sequence number | 3 | 1 | 0 | 1 | 33 | 40 | 29 | 40 | 19 | 37 | Running time/s | 7456 | 29586 | 6920 | 27762 | 8578 | 34822 | 8484 | 34178 | 6761 | 25763 | Optimal assembly sequence fitness value | 7.0 | 6.4 | 6.8 | 6.5 | 2.4 | 2.4 | 3.50 | 2.3 | 2.9 | 2.4 | Local optimal-fitness average value | 10.08 | 8.17 | 12.77 | 9.98 | 5.27 | 3.79 | 5.16 | 4.13 | 5.77 | 3.74 |
|
|