Science and Technology of Nuclear Installations / 2016 / Article / Tab 2 / Research Article
ROSA/LSTF Tests and RELAP5 Posttest Analyses for PWR Safety System Using Steam Generator Secondary-Side Depressurization against Effects of Release of Nitrogen Gas Dissolved in Accumulator Water Table 2 Major test conditions in each LSTF test.
Item Condition Initial core power 10 MW Initial pressurizer pressure 15.7 MPa Initial hot leg fluid temperature 600 K Initial cold leg fluid temperature 563 K Initial SG secondary-side pressure 7.3 MPa Initial SG secondary-side collapsed liquid level About 10 m Generation of scram signal Pressurizer pressure = 12.8 MPa Generation of safety injection signal Pressurizer pressure = 12.1 MPa Start of SG secondary-side depressurization 10 s after safety injection signal Start of auxiliary feedwater injection About 2 min after safety injection signal Actuation of ACC system Primary pressure = about 4 MPa Actuation of LPI system Primary pressure = 1.0 MPa