Research Article

Early-Warning Method of Train Running Safety of a High-Speed Railway Bridge Based on Transverse Vibration Monitoring

Figure 3

Correlations between the amplitude parameters of the transverse accelerations in the middle of the first main span and the speed of the trains.
(a) Correlation between the peak value of transverse accelerations and the speed of trains
(b) Correlation between the RMS value of transverse accelerations and the speed of trains