Design parameters of anchor cables of eastern, southern, and western support pile systems.

Location Anchor cable location Dip Anchor cable length Anchoring segment length Anchoring location Rod form

1st anchor cable −9.0 m10°~15°25.0 m17.0 mOne pile with one anchor 7 steel strands
2nd anchor cable −12.0 m10°~15°25.0 m17.0 mOne pile with one anchor 7 steel strands
3rd anchor cable −15.0 m10°~15°25.0 m17.0 mOne pile with one anchor 7 steel strands
4th anchor cable −18.0 m10°~15°25.0 m17.0 mOne pile with one anchor 7 steel strands