Research Article

The Effect of Rail Fastening System Modifications on Tram Traffic Noise and Vibration

Figure 1

Schematic cross sections of rail discrete bearings with ZG-3/2, PPE, and DEPP fastening systems.
(a) ZG 3/2 fastening system
(b) PPE fastening system
(c) DEPP fastening system