Research Article
Design and Control of Glycerol-tert-Butyl Alcohol Etherification Process
Table 5
Economic evaluation.
| Reactor | | Column C1 | Column C2 | Column C3 | Column EX | Column C4 |
| Diameter (m) | 0.35 | Reflux ratio | 0.32 | 1.83 | 4 | 1.5 | 2 | Diameter (m) | 0.85 | 0.55 | 0.7 | 0.5 | 0.55 | No of trays | 6 | 15 | 41 | 30 | 7 | Height (m) | 2 | Reboiler duty (kW) | 343 | 170 | 716.2 | 525 | 563.3 | Condenser duty (kW) | 348.7 | 168.6 | 654 | 170 | 324.4 | Cost ($) | 9296 | Cost ($) | 297 966 | 221 775 | 589 424 | 759 704 | 338 157 |
| Energy Cost = 291 663$/year | Equipment Cost = 2 440 746$ | TAC = 535 738$/year (10 years payback) |
|
|