| Determine which impacts to sea turtles need to be monitored: |
| The energy resource is | | Wind | Go to A | Tidal | Go to B | Waves | Go to C | (A) The wind turbine foundation is | | Monopile OR tripod OR floating mooring | Go to A1 | Lattice OR gravity | Go to A2 | (A1) The stage of the monopile or tripod or floating mooring wind turbine project is | | Construction | W1, W3, W4, W5, W8 | Operation | W1, W3, W4, W5 | Decommissioning | W1, W3, W4, W5, W8 | (A2) The stage of the lattice structure or gravity foundation wind project is | | Construction | W1, W3, W4, W5, W8 | Operation | W1, W3, W4, W5 | Decommissioning | W1, W3, W4, W5, W6, W7, W8 | (B) The tidal turbine type is | | Open OR shrouded bottom-mounted | Go to B1 | Open OR shrouded floating mooring | Go to B2 | (B1) The stage of the bottommounted tidal turbine project is | | Construction | W1, W3, W4, W5, W8 | Operation | W1, W3, W4, W5 | Decommissioning | W1, W3, W4, W5, W6, W7, W8 | (B2) The stage of the floating mooring tidal turbine project is | | Construction | W1, W3, W4, W5, W8 | Operation | W1, W3, W4, W5 | Decommissioning | W1, W3 W4, W5, W8 | (C) The stage of the wave energy device is | | Construction | W1, W3, W4, W5, W8 | Operation | W1, W3, W4, W5 | Decommissioning | W1, W3, W4, W5, W8 |
|
|