Research Article
Safety Early Warning Research for Highway Construction Based on Case-Based Reasoning and Variable Fuzzy Sets
Table 2
Historical data sheet.
| Project number | Warning degree | Workload when working at height | Safety protection level | Engineering geological conditions | Installation and usage of machinery | Workers without safety training | Organizational ability | Safety material status |
| 1 | 2 | 0.3 | 82 | 2 | 82 | 0.14 | 68 | 1 | 2 | 2 | 0.38 | 64 | 0 | 72 | 0.15 | 84 | 1 | 3 | 1 | 0.2 | 73 | 2 | 93 | 0.11 | 84 | 1 | 4 | 1 | 0.34 | 83 | 2 | 91 | 0.12 | 82 | 2 | 5 | 2 | 0.22 | 74 | 0 | 94 | 0.1 | 88 | 2 | 6 | 1 | 0.32 | 94 | 2 | 95 | 0.2 | 80 | 2 | | | | | | | | | | 30 | 1 | 0.34 | 85 | 2 | 83 | 0.12 | 79 | 0 | 31 | 2 | 0.35 | 65 | 2 | 81 | 0.08 | 70 | 2 | 32 | 1 | 0.3 | 90 | 1 | 85 | 0.15 | 88 | 2 | 33 | 2 | 0.35 | 72 | 1 | 72 | 0.14 | 65 | 1 | 34 | 1 | 0.22 | 68 | 1 | 85 | 0.04 | 88 | 1 | 35 | 1 | 0.25 | 85 | 2 | 80 | 0.12 | 85 | 1 | 36 | 2 | 0.35 | 70 | 1 | 68 | 0.14 | 70 | 1 |
|
|