Research Article
A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory
Table 5
Taking value of three risk degree indexes.
| Possibility | Probability | Result | Caused accident possibility | Taking the value of M | Caused accident probability | Taking the value of P | The result caused by accident | Taking the value of F |
| Sustainably occur | 10 | Very large possible occurrence | 10 | Extreme large accident, shutdown, and rectification | 10 | Often occur | 8 | Large possible occurrence | 8 | Very large accident, causing death | 9 | Occur for many times | 6 | Possible occurrence | 6 | Severe accident, having severe injury | 7 | Occur in a few times | 5 | Occur for once a while | 5 | Accident, having slight injury | 5 | Occur for very few times | 3 | Rare occurrence | 3 | Small accident, having minor injures | 3 | Basically not occur | 1 | Basically impossible | 1 | Very small accident, no injury | 1 |
|
|