| | The fuzzy evaluating vectors | Rating |
| Volatility (C1) | | (M, G) | Solubility (C2) | | (M, G) | Radioactivity (C3) | | (M, G) | Corrosivity (C4) | | (P, M) | Acidity and alkaline (C5) | | (P, M) | Acute toxicity (C6) | | (M, G) | Extraction toxicity (C7) | | (M, G) | Air (C8) | | (M, G) | Soil (C9) | | (P, M) | Geology (C10) | | (P, M) | Hydrology (C11) | | (M, G) | Ecology (C12) | | (M, G) | Population density (C13) | | (M, G) | Industry (C14) | | (P, M) | Agriculture (C15) | | (M, G) | Tourism (C16) | | (M, G) | Animal husbandry (C17) | | (M, G) | Distance of community (C18) | | (M, G) | Seepage line and dry beach length (C19) | | (P, M) | Height and capacity (C20) | | (P, M) | Damming mode (C21) | | (P, M) | Type of tailings (C22) | | (M, G) | Service period (C23) | | (M, G) | Material of dam (C24) | | (P, M) | Returning reservoir (C25) | | (M, G) | Seepage shaft (C26) | | (M, G) | Drainage (C27) | | (M, G) | Flood discharge trench (C28) | | (M, G) | Flood draining facility (C29) | | (M, G) | Revetment construction maintenance (C30) | | (M, G) | Dam safety monitoring (C31) | | (M, G) | Daily management (C32) | | (M, G) | ISO authentication (C33) | | (M, G) | Emergency capacity of rescuing facilities (C34) | | (M, G) | Capacity of emergency protection and eliminating leak (C35) | | (M, G) |
| Support of government (B10) | | (M, G) | Using proportion (B11) | | (P, M) | Technology maturity (B12) | | (M, G) | Physical characteristic (B1) | | (M, G) | Chemical characteristic (B2) | | (M, G) | Natural environment (B3) | | (P, M) | Social environment (B4) | | (M, G) | Characteristics of dam body (B5) | | (P, M) | Drainage installation (B6) | | (M, G) | Flood drainage facility (B7) | | (M, G) | Risk prevention (B8) | | (M, G) | Emergency response (B9) | | (M, G) |
| Characteristics of solid waste (A1) | | (M, G) | Characteristics of environment (A2) | | (M, G) | Tailing dam risk (A3) | | (M, G) | Risk management (A4) | | (M, G) | Utilization prospect (A5) | | (M, G) |
| Final objective | | (M, G) |
|
|