Stability Calculation Method of Slope Reinforced by Prestressed Anchor in Process of Excavation
Table 4
Different condition control parameters of sliding surface.
| Working condition | Working phase | Sliding surface search variables | Slip plane center coordinates and radius | Security coefficient | | | | | | |
| A | I | 2.8053 | 4.0 | 63.718 | −11.575 | 11.102 | 16.039 | 1.3136 | II | 3.458 | 6.0 | 90 | −3.4764 | 6 | 6.9344 | 1.344 | III | 5.6106 | 8.0 | 68.098 | −14.328 | 16.016 | 21.49 | 1.3222 | IV | 5.0633 | 10.0 | 90 | −7.3434 | 10 | 12.407 | 1.3424 | V | 7.8159 | 12.0 | 69.327 | −23.373 | 23.769 | 33.335 | 1.3684 |
| B | I | 3.1053 | 4.0 | 61.633 | −10.456 | 11.322 | 15.412 | 1.6848 | II | 3.258 | 6.0 | 90 | −3.8959 | 6 | 7.1539 | 1.6456 | III | 5.4106 | 8.0 | 72.964 | −10.349 | 12.829 | 16.483 | 1.5981 | IV | 6.5633 | 10.0 | 73.361 | −13.449 | 15.981 | 20.887 | 1.45 | V | 7.2159 | 12.0 | 74.49 | −18.013 | 19.001 | 26.182 | 1.4209 |
|
|