Research Article

Real-Time Safety Risk Assessment Based on a Real-Time Location System for Hydropower Construction Sites

Figure 6

Simulated calculation results illustrating worker safety risk.
235970.fig.006a
(a) Real-time risk associated with the dynamic hazard
235970.fig.006b
(b) Real-time risk associated with the static hazard
235970.fig.006c
(c) Real-time reduction factor associated with the safety supervisor
235970.fig.006d
(d) Integrated real-time safety risk