Research Article

Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station

Table 2

Detailed conditions of surface buildings.

BuildingsFoundation types/buried depthNumber of storiesHeight/mConstruction time

Guanglu CinemaBox foundation (−6 m)6201999
Women’s world buildingBox foundation (−7.5 m)4201995
Meigui HotelBox foundation (−7.5 m)20701987
Laobian restaurantPile foundation (−8 m)7251992
North Trade BuildingPrecast pile foundation (−8.5 m)6301994
Shenyang commercial centerStrip foundation (−11.6 m)6301991