Research Article
Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
Table 3
Management critical value for settlement of ground surface and building.
| ||||||||||||||||||||||||||||||||||||||||||||||||||
denotes the length of the existing building in the direction perpendicular to the tunnel axis. |