Research Article
Calculation of Reaction Forces in the Boiler Supports Using the Method of Equivalent Stiffness of Membrane Wall
Table 1
List of positions according to Figure
4.
| Pos. | Type | Dimensions | Pos. | Type | Dimensions |
| 1 | Shell and end of drum | mm | 14 | Collector header of side wall | mm |
| 2 | Downcomers | × 16 mm | 15 | Collector header of rear wall of third pass | mm |
| 3 | Connecting pipe | mm | 16 | Side wall of second pass | Pipe: mm Tape: mm Step: mm Number of pipes: |
| 4 | Collector header of rear wall of first pass | mm | 17 | Rear wall of second pass | Pipe: mm Tape: mm Step: mm Number of pipes: |
| 5 | Front wall of first pass | Pipe: mm Tape: mm Step: mm Number of pipes: | 18 | Side wall of third pass | Pipe: mm Tape: mm Step: mm Number of pipes: |
| 6 | Side wall of first pass | Pipe: mm Tape: mm Step: mm Number of pipes: | 19 | Rear wall of third pass | Pipe: mm Tape: mm Step: mm Number of pipes: |
| 7 | Rear wall of first pass | Pipe: mm Tape: mm Step: mm Number of pipes: | 20 | Buckstays | HE-B120 |
| 8 | Collector header of wall of hopper | mm | 21 | Distributor header of rear wall of second pass | mm |
| 9 | Connecting pipes | mm | 22 | Wall of hopper | Pipe: mm Tape: mm Step: mm Number of pipes: |
| 10 | Distributor header of side wall | mm | 23 | Distributor header of rear wall of first pass | mm |
| 11 | Distributor header of front wall | mm | 24 | Distributor header of wall of hopper | mm |
| 12 | Collector header of front and rear wall of second pass | mm | 25 | Distributor header of rear wall of third pass | mm |
| 13 | Side wall in transition zone | Pipe: mm Tape: mm Step: mm Number of pipes: | | | |
|
|