Research Article

Modeling, Control, and Simulation of Battery Storage Photovoltaic-Wave Energy Hybrid Renewable Power Generation Systems for Island Electrification in Malaysia

Figure 24

Output line voltage response with change in required load power. (a) Output line voltages throughout the full simulation time; (b) output line voltage when the load increases at simulation time from 3.96 s to 4.06 s; (c) output line voltage when the load decreases at simulation time from 11.97 s to 12.07 s.
436376.fig.0024a
(a)
436376.fig.0024b
(b)
436376.fig.0024c
(c)