Research Article

Heuristics for Multiobjective Optimization of Two-Sided Assembly Line Systems

Table 11

Results of EHA, SAA, and source paper for TALBP.

Problem identifierCT
min
Minimum number of workstations Minimum unbalance time
Source
Paper
EHASAASAA ( as perturbation termination)SAA ( as perturbation termination)
Trail numberEHATrail numberTrail number
123451234512345

P9
(Kim et al., 2009 [2])
455555550.990.990.990.990.990.990.990.990.990.990.99
544444440.990.990.990.990.990.990.990.990.990.990.99
633333330.970.970.970.970.970.970.970.970.970.970.97

P12
(Kim et al., 2009 [2])
566
7
6
7
6
7
6
7
6
7
6
7
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
2.00
1.05
655555551.961.961.961.961.961.961.961.961.961.961.96
744444443.013.013.013.013.013.013.013.013.013.013.01

P1961212121212122.902.902.902.902.902.902.902.902.902.902.90

P24
(Kim et al., 2009 [2])
2088888880.991.980.991.980.990.990.990.990.990.990.99
2567777776.006.007.007.026.007.006.006.006.006.006.00
3056666669.069.069.069.0610.999.069.069.069.0610.999.06
35555555512.9815.9812.9816.4815.9812.9815.9812.9812.9815.9812.98
4044444447.007.007.0012.9512.957.007.007.007.007.007.00

P47
[14]
102/6088888818.0219.6816.74 14.6918.2914.6914.6916.74 14.6914.69