Energy saving performance of BPG systems.

Items25 MW biomass-only fired140 MW cofiring25 MW cofiring1 MW gasification5.5 MW gasification

Energy savingsa (GJ/GJ)2.573.444.422.682.66
Cost of energy saving (yuan/GJ)29.510.58.321.822.3
Cost of energy saving (GJ biomass/GJ)1.660.990.982.301.55

aIn the case of cofiring systems, coal transportation in reference system was not taken into consideration.