Research Article

A Multiobjective Interval Programming Model for Wind-Hydrothermal Power System Dispatching Using 2-Step Optimization Algorithm

Table 1

Basic parameters of thermal power plants.

IndexCapacity (MW)Min output (MW) (MW/h)

112005002.8 × 10−60.27413.74.692−6.3745.06548
212005001.39 × 10−50.25914.55.472−6.8125.72360
36002806.11 × 10−50.2796.354.312−5.7645.36536
412004808.3 × 10−40.26914.15.836−6.7354.92650
57203303.33 × 10−50.3124.646.548−6.2645.56940