Research Article

Stability Analysis of a Run-of-River Diversion Hydropower Plant with Surge Tank and Spillway in the Head Pond

Table 2

Pairs of gains selected for carrying out simulations.

PointStability
Normal operationFlood operation

A202NOYES
B1002YESYES
C1802NOYES
D503NOYES
E1503NOYES
F2503NONO