Research Article
Volumetric Verification of Multiaxis Machine Tool Using Laser Tracker
Table 6
Results of rotational axis verification in XCFZ machine.
| Average initial error in module (m) | 22.7 | 194.9 | Maximum initial error (m) | 37.6 | 213.5 |
| Average final error in module 1 phase (m) | 14.4 | 112.6 | Maximum final error 1 phase (m) | 19.1 | 186.1 | Residual error 1 phase (%) | 63.6 | 57.7 |
| Average final error module 2 phases TR (m) | 2.7 | 15.1 | Maximum final error 2 phases TR (m) | 4.2 | 65.1 | Residual error 2 phases TR (%) | 11.9 | 7.8 |
| Average final error module 2 phases RT (m) | 1.3 | 18.7 | Maximum final error 2 phases RT (m) | 3.1 | 64.8 | Residual error 2 phases RT (%) | 5.9 | 9.6 |
|
|