]>Particle Swarm Optimization for Constrained Instruction Scheduling : Table 1
Table 1: Schedule length in cycles generated by different scheduling algorithms.

Benchmark (node/edges)Resource-constraintsILP-based CPLEXFDSMB-list schedulingMB-MMAS (average of 5 runs)PSO-CIS (average of 5 runs)

HAL(21/25) 1a, 1fm, 1m, 3i, 3o88888
ARF(28/30) 2a, 1fm, 2m1111111111
EWF(34/47) 1a, 1fm, 1m27282827.227.4
FIR(40/39) 2a, 2m, 3i, 3o13191917.217
COSINE1(66/76) 2a, 2m, 1fm, 3i, 3oX181917.417.2
COSINE2(82/91) 2a, 2m, 1fm, 3i, 3oX232321.221.2