Results of our method and the optimal DP method. Four sizes are available for each cell. % is the percentage timing improvement, % is the percentage change of total cell area (negative value means deterioration).

Ckt Number of cells Number of crit. cells DNFOpt. DP
Delay (ns) % % Runtime (sec) Delay (ns) % % Run time (sec)

C432 160 50 3.2 11.9 −9.9 9 3.1 13.2 −10.0 103
C499 202 51 3.5 11.9 −9.4 14 3.5 12.4 −9.3 119
C880 383 77 3.5 14.8 −9.9 19 3.4 16.2 −10.0 195
C1355 544 85 4.5 6.8 −8.1 22 4.4 7.0 −8.8 489
C1908 880 88 5.5 16.1 −9.8 39 5.4 17.0 −10.0 556
C2670 1.3 K 91 3.4 9.6 −9.5 38 3.4 11.1 −9.7 908
C3540 1.7 K 124 5.0 16.8 −9.0 69 4.8 19.0 −9.4 1724
C5315 2.3 K 138 5.3 10.0 −6.9 70 5.3 10.2 −7.9 3228
C6288 2.4 K 299 14.1 11.5 −8.1 97 14.1 11.7 −9.1 14998
C7552 3.5 K 199 7.3 9.9 −8.2 112 7.2 11.5 −7.5 6847

Average 1336 120 11.9 −8.9 48 12.9 −9.2 2916