Research Article
Investigation of a Superscalar Operand Stack Using FO4 and ASIC Wire-Delay Metrics
Table 10
Cycle/access times versus issue width.
| ā | IW 1 | IW 2 | IW 3 | IW 4 |
| Access | 0 ps | 195 ps | 390 ps | 585 ps | Time | (0) | (4.3) | (8.7) | (13.0) | Cycle | 397 ps | 592 ps | 787 ps | 982 ps | Time | (8.8) | (13.1) | (17.5) | (21.8) |
|
|