Abstract

In this paper, a new simultaneous framework of distribution network operation is proposed based on the scheduling of photovoltaic/wind/battery multi-microgrids with network reconfiguration considering self-healing. The objective function is considered to minimize the energy losses, and multi-microgrids cost and improve the reliability indices including minimization of energy not-supplied (ENS) and minimizing system average interruption duration (SAIDI) and system average interruption frequency (SAIFI) indices. The optimization variables are defined as the situation of the distribution network switches to find the network’s optimal configuration with the installation location and size of renewable resources and battery energy storage during 24 hours. An improved beluga whale optimization (IBWO) based on a nonlinearly diminishing inertia weight (NDIW) approach is used to find the optimal variable set of the problem. The recommended methodology is implemented on 33-bus and real 59-bus distribution networks. The results demonstrated that by obtaining an optimal state of the network switches in the event of a fault, as well as the optimal scheduling of the two microgrids, the energy losses have decreased and the reliability indices have improved. The outcomes of the proposed methodology based on the hybrid multi-microgrid allocation and network reconfiguration are stated that the losses, ENS, SAIDI, and SAIFI are reduced by 66.39%, 54.00%, 50.24%, and 33.61%, respectively, for 33-bus network and are declined by 65.29%, 57.44%, 48.63%, and 62.33%, respectively, for the real 59-bus Ahvaz network in comparison with the base network. The obtained results illustrated that in the condition of the network line outage, by simultaneously implementing the reconfiguration with the change of network switches and the optimal allocation and scheduling of HMGs in the network, self-healing is provided to prevent a significant weakening of the network performance so that the resilience is improved in addition to minimizing the energy losses and the cost of HMG energy injection compared to the base network. The findings revealed that the objectives including losses, ENS, SAIFI, and SAIDI are increased by 78.29%, 33.00%, 83.33%, and 35.11%, respectively, due to outage of line 22 of the 33-bus network and these objectives are increased by 52.32%, 10.30%, 32.29%, and 79.66%, respectively, due to outage of line 12 of the 59-bus network compared with not considering the line outage. Moreover, the superior capability of the recommended NDIW-based IBWO has been confirmed in comparison with the well-known particle swarm optimizer (PSO) and ant lion optimizer (ALO) in solving the problem to achieve better objective value.

1. Introduction

1.1. Motivation and Backgrounds

The improvement of distribution network reliability is one of the key objectives in today’s operational planning of distribution networks. The duty of distribution networks in meeting subscriber needs is growing increasingly important, and other traditional distribution networks are no longer responsive to subscriber needs due to the increasing consumption of electrical energy, changing customer behavior and demographics, and expanding subscriber numbers [1]. Although distribution networks are responsible for the bulk of consumer outages, many subscriber outages are also caused by distribution network problems, which can lead to component failures, line outages, and subscription outages [2]. Due to a lack of automation and reliance on manual processes for conventional distribution networks, there are more subscribers and longer outages as a result of a variety of factors and lax monitoring. As a result, the network’s level of reliability declines [3, 4]. Also, the concern over climatic and environmental alterations, as well as the rise in emissions of greenhouse gases, has prompted researchers to consider alternatives to conventional production sources for power systems that utilize fossil fuels. As a result, renewable energy sources play a significant role in smart distribution networks. Network operators have become interested in microgrids because they can improve the reliability of the network by including renewable energy sources and storage components [5]. On the other hand, via microgrids based on energy from renewable sources, it is possible to increase self-healing [6] and reliability in the event of a mistake or outage of network lines based on the automation of the distribution network based on reconfiguration, by changing the state of the network switches.

1.2. Literature Review and Research Gap

Numerous researches have been done in the area of operating distribution networks according to the planning of renewable energy sources, particularly hybrid energy microgrids (HMGs). To minimize costs, simultaneous installation of remote control switches and manual control is a challenge that is addressed in [7]. To solve this problem, reliability indices and HMGs are utilized in this study. To assess the kind and condition of automation technology concurrently, as well as to reduce costs and boost reliability metrics, integer linear programming is provided in [8]. HMG and its impact on enhancing reliability are not taken into account in this study. To cut costs and boost reliability indices, self-healing has been improved by employing electric vehicle parking planning ability in Ref. [9]. The effectiveness of reconfiguring based on network switches to increase reliability has not been assessed in this research. In [10], the evolutionary algorithm is used to develop the best option for distributed generation allocation to increase reliability in a distribution network. The use of HMGs and network reconfiguration was not attempted in this study to increase resilience. In [11], the optimum functioning of electric vehicles and energy sources is implemented in a smart network with the capability to inject electricity into the grid to minimize the cost of bought power from the primary electrical system and the penalty of weakening resilience. It is discovered where to install and how big to make these components so as to maximize profitability. In [12], an advantageous approach for allocating electric parking lots to enhance network dependability and cost minimization is performed in distribution networks. According to various degrees of vehicle adoption and resilience, Landi et al. [13] present distributing the electric parking lots for minimizing operational costs, the cost of charging and discharging vehicles, and the cost of obtaining electricity from the main grid. The impact of reconfiguration and energy multi-HMGs on reliability measures is not assessed in [1113]. In [14], the augmented genetic optimization technique is examined for the static reconfiguration of balanced networks to reduce losses and increase resilience. In [15], a combination of the exchange market algorithm and the wild goat algorithm is presented for dynamic multi-criterion reconfiguration of balanced distribution networks to identify the best network configuration for reliability improvement and loss minimization. The impact of energy multi-HMGs on reliability metrics is not examined in [14, 15]. In [16], it allocates the PVs and WTs in a balanced network using a hybrid teaching-learning-gray wolf optimizer method to reduce losses and improve dependability. In [17], the bat algorithm is used to schedule wind and solar resources while taking resilience. According to [18], network reconfiguration and PV and WT allocation in a balanced network are recommended for lowering losses and voltage variations and enhancing voltage stability and dependability with the use of a moth flame optimizer. The impact of reconfiguration on reliability metrics is not assessed in [17, 18]. In [19], a method for dynamic reconfiguration is presented that minimizes losses and voltage variations to increase network resilience. Using particle swarm optimization, Sannigrahi et al. [20] develops an allocation of integrated energy resources with regulated network reconfiguration to increase voltage stability and resilience, lower pollution, and maximize net savings. The improvement in self-healing under fault incidence in the network is not assessed in this study. A line hardening and DG setup technique is provided in [21] with the goal of improving distribution network reliability while reducing load reduction across the board using updated column and restriction-producing algorithms. In [22], a mixed-integer programming model is used for carrying out restoration scheduling for grid-enabled electric vehicles in the distribution network in an effort to reduce the overall cost of system functionality loss. To reduce the investment cost, Hou et al. [23] proposes a distribution network reliability upgrade that is structured as a mixed-integer linear programming model with the installation of DGs, the allocation of mobile backup generators, and the deployment of switches. In [24], the resilient distribution network operation is evaluated in the presence of smart parking lots and renewable energy sources. Demand response applications, battery energy storage devices, and standby diesel generators are recommended to enhance the network’s resiliency. In [25], a mixed-integer linear programming framework is developed for the best placement of backup DGs and sectionalizing switches to increase reliability in emergency situations while taking into account energy unnerved. In [26], the distribution network’s robustness is improved to both the direct and indirect effects of strong winds by taking into account the wide range of batteries. The objective function of the reduced vital loads achieves the optimal quantity of power and energy for batteries for different technologies. In [27], an operational structure that utilizes mobile energy hubs and the shortest path algorithm is presented to enhance distribution network resilience. To maximize the restoration of important loads, an efficient management solution is also offered to improve the performance of electrical distribution networks. The impact of energy multi-HMGs, network reconfiguration, and self-healing is not examined or assessed in [2327] for reliability metrics. The literature review summary is presented in Table 1.

Following an assessment of the literature, the following research gaps are listed: (i)Reviewing the studies revealed that the utilization of electric parking lots, distributed production resources, renewable energy sources, network reconfiguration by identifying the open and closed switches of the network, and the best allocation of resources have all been done in order to improve the self-healing of the network and increase resilience. The impact of choosing the installation site and the ideal capacity of renewable resources on enhancing the network’s dependability has been examined in some research. Studies have revealed that simultaneous employment of integrated approaches to increase reliability and self-healing improvement is less common(ii)The issue of enhancing self-healing brought on by fault-related conditions by applying network automation based on reconfiguration as well as multi-HMGs based on storage element has not been addressed in the studies that have been undertaken. The absence of a multi-objective planning operation to achieve the best configuration of the network, locate the placement of the energy HMGs within the network, and plan their energy distribution over the study horizon is consequently simultaneously felt(iii)The operation of renewable energy HMGs simultaneously with storage components in distribution networks and network reconfiguration presents a number of difficulties, among them the most important of which is figuring out where to place HMGs in the network, where to plan for resources and storage, and how to best configure the network. If these factors are wrongly determined, the performance of the network will suffer. However, due to their early convergence problems, particularly in the case of multi-HMGs, conventional approaches are unable to overcome this problem. On the other hand, in order to optimally determine the open and closed switches of the network, the best location for installation, and the capacity of the energy multi-HMG components during the study period, it is essential to set up a metaheuristic method with high exploration and exploitation power

1.3. Contributions

According to the existing research gaps, the contributions of this research are presented as follows: (i)This study presents the operation of 33-bus and a real 59-bus distribution network allocation and scheduling using the multi-HMG structure of energy with network reconfiguration to improve reliability while taking self-healing into account(ii)The reliability of the network has been increased based on the scheduling of multi-microgrids, including photovoltaic and wind energy sources integrated with battery storage, and simultaneously adjusting the state of the network switches in the event of a fault and injecting its planned power into the distribution network(iii)A multi-objective function is defined, which includes minimizing energy loss; improving reliability indices like ENS (energy not-supplied), SAIDI (system average interruption duration index), and SAIFI (system average interruption frequency index); and minimizing the cost of multiple HMGs(iv)The optimal state of network switches or optimal network configuration, as well as the ideal location for installing multi-HMGs and their optimal scheduling, has all been found via an improved metaheuristic algorithm. The conventional beluga whale optimization (BWO) is inspired according to behaviors of pair swim, prey, and whale fall [28]. In this paper, conventional BWO is improved based on the nonlinearly diminishing inertia weight approach [29] to overcome the premature convergence and the improved version named IBWO

1.4. Paper Structure

The HMG component modeling is given in Section 2. The problem objective function and the constraints are formulated in Section 3. The proposed optimization approach and its steps for problem solving are presented in Section 4. In Section 5, simulation results in different scenarios are given. Finally, the outcomes of the study are concluded in Section 6.

2. HMG System Modeling

An HMG made up of solar (PV) energy sources, wind turbine (WT) energy sources, and battery (BA) storage is taken into consideration in this study according to Figure 1. The DC/AC converter is the last piece of apparatus before the load in the HMG system, and its job is to convert DC power to AC power. Battery storage is used in HMG to equalize power oscillations and provide continuous power with the necessary level of dependability to the load on the distribution network.

2.1. PV Model

The PV array’s power output is determined using its surface temperature, rated power, and radiation intensity as follows [30, 31]. where is the radiation perpendicular to the surface of the array (W/m2), is the number of panels, is the rated power of each PV panel, is the amount of standard radiation (i.e., 1000 W/m2), is the temperature coefficient of the PV panel (-0.0037 per degree Celsius), is the temperature of the PV in the reference condition, and represents the temperature of the cell.

2.2. WT Model

This nonlinear relationship between the power WT extracts and changes in wind speed is shown in the following charts [30, 31]: where is the output power of WT, the rated power of each turbine, is the wind speed. , , and are the cut-in speed, cut-out speed, and rated wind speed, and indicate the number of WTs.

2.3. Battery Charge and Discharge Models

(i)Charging model: the battery is put into a charging state when , and the extra electricity of the HMG is supplied into it. The energy content of the batteries at time is computed in the following way [30, 31]:where and are the battery energy values at hours and , is the load demand at time , is the inverter efficiency, is self-discharge, is time steps (1 hour), and refers to the battery charging yield. (ii)Discharge model: the batteries are in discharge mode when , to make up for the network load power deficiency (), and the batteries can make up for an HMG lack of power. The energy of the batteries at time is computed as follows [30, 31]:

2.4. Inverter Model

The transferred power from the inverter to the load demand is computed by where is the battery power injected to the inverter and also denotes renewable energy source power transmitted to the inverter.

3. Problem Formulation

This study uses the improved beluga whale optimization algorithm (IBWO) based on the inertia weight method to tackle the problem of operating 33- and real 59-bus distribution networks based on HMG scheduling and network reconfiguration while taking the self-healing improvement approach into consideration. The objective function of the issue and restrictions, the suggested method of optimization, and how it was used to resolve the issue are all provided in this part.

3.1. Objective Function
3.1.1. Power Losses

According to the current flowing through the network lines and accounting for their ohmic resistance and reactance, the network’s total active power loss () is represented as follows [14, 16]: where and are the ohmic resistance and reactance of the line , is the number of network lines, is the current passing through the line , and and are the voltage of buses and .

3.1.2. ENS

As a statement of the network subscribers’ disrupted energy owing to the outage of the network lines, the reliability index in the form of energy not-supplied (ENS) can be described as follows [14, 16]. where is the total energy not-supplied of network subscribers, is number of lost loads due to line outages or fault, is the rate of line outages, is the length of line , is the duration of line repair, and is the amount of lost load due to line outages.

3.1.3. SAIDI

Another reliability index is the system average interruption duration index (SAIDI), which represents the average total duration of power outages per customer, which is computed as follows [14, 16]: where represents the number of subscribers at load point , represents the failure rate of load point , and , where represents the outage time.

3.1.4. SAIFI

Another reliability index, the system average interruption frequency index (SAIFI) indicates the average number of power outages per customer, which is defined as follows [14, 16]:

3.1.5. HMG Cost

Minimizing the present value cost (NPC) of the HMG system, which includes investment costs () and maintenance cost () over the system’s useful life, is another goal. is the price of WTs, PVs, batteries, inverters, and related to WTs, PVs, and batteries. The NPC is formulated as follows [3032]: where , , , and represent the purchase cost of each PV array, WT, battery, and inverter. , , , and indicate the number of PV arrays, WTs, batteries, and inverters. , , and also refer to the annual maintenance cost of PV arrays, WT, and batteries.

3.1.6. Multi-objective Optimization

The power loss minimization, enhancement of reliability indices, and reduction of HMG cost are all components of the problem’s objective function. The weighting coefficient approach is formulated in this study to solve the total objective function with various dimensions as follows [33]: where , , , , and are the weighting coefficients of losses, ENS, SAIFI, SAIDI, and HMG cost functions, respectively, such that the absolute value of their sum must be equal to 1. , , , , and refers to the maximum value of losses, ENS, SAIFI, SAIDI, and HMG cost.

3.2. Constraints

The prior subsection’s objective function should be optimized under the subsequent equality and inequality constraints [14, 16].

3.2.1. Power Balance

where and refer to the active and reactive power injected into the grid from the substation, and refer to the active and reactive power transferred from the hybrid system into the grid, indicates the number of hybrid systems (2 in this study), and denote the active and reactive losses of the grid lines, and and are the active and reactive load of the distribution network.

3.2.2. Bus Voltage

Bus ’s voltage range must fall within the permitted range, which is as follows: where and represent the lower and upper network bus voltages.

3.2.3. Maximum Allowable Currents

Line ’s current must be below its limit to cross through: where is the upper current passing through the lines.

3.2.4. HMG Components

Equipment for HMG systems must have the following maximum and minimum ranges [3032]: where and are the lower and upper numbers of PV panels, and refer to the minimum and upper numbers of WTs, and represent the lower and upper numbers of batteries, and indicate the lower and upper energies of the battery as , and indicates the depth of battery discharge.

3.2.5. Network Radiality

The distribution network’s radial state should be preserved as follows during network reconfiguration. In order to verify the network’s radiality, an incidence matrix is first defined. There are network lines and network buses in this matrix, which is a by matrix. If the determinant of this matrix decreases to zero after it is formed, the network is not a radial network; if it means , the network is a radial network [34].

4. Optimization Method and Implementation

The operation of a 33- and 59-bus distribution networks based on multi-HMG scheduling and network reconfiguration taking self-healing into account is discussed in this part. It is solved using the enhanced beluga whale optimization (BWO) algorithm based on the inertia weight method (IBWO) [28]. Beluga whale actions like swimming, hunting, and falling are the inspiration for the BWO.

4.1. Inspiration

The beluga whale, a marine mammal, is identified based on its white pigmentation and diversified utterances. Several belugas are maintained in aquariums in which they exhibit an energetic look and smooth motion. Some belugas are maintained in aquariums, as depicted in Figure 2(a), and they have a cheerful appearance and graceful movement. The social-sexual behaviors of beluga whales under human care include lateral and vertical swimming, synchronized submersion, and synchronized milling. Moreover, they may explode bubbles, open their mouths to eat, and swim rapidly towards or away from other creatures. Beluga whales are interested in humans and demonstrate activities such as frolicking, swimming, and vocalization. Beluga whales are social animals that can congregate in groups of two to twenty-five individuals, on average ten individuals. They consume a variety of prey, such as crustaceans, nematodes, codfish, trout, and salmon (Figure 2(b)). Due to the dense population density in estuaries, killer whales, polar bears, and humans pose a threat to these animals. Over immigration, whales perish and sink to the ocean floor, providing sustenance for many different things (Figure 2(c)) [28].

The beluga whale optimization (BWO) is affected by beluga whales’ swimming, foraging, and falling actions. This is how the BWO mathematical model is created.

4.2. Mathematical Model

The BWO mimics the swimming and other actions of beluga whales and foraging. Similar to other metaheuristics, BWO is comprised of the exploration and exploitation phases. Through the arbitrary choice of beluga whales, the discovery phase enables global looking in the layout space, whereas the exploitation phase governs local searching. For modeling the actions of beluga whales, it is assumed that they are search agents that can move in search space by modifying their position vectors. Moreover, BWO incorporates the chance of whale collapse, which adjusts the corresponding positions of beluga whales [28].

Because of BWO’s population-centered methodology, beluga whales are seen as searching agents, and each one represents a potential solution that has undergone overoptimization. The following is the layout of the agent location discovery matrix [28]: where is the dimension of design variables and is the beluga whale population size. Several physiological parameters have been collected for every living beluga whale [28]:

Based on the equilibrium factor , the BWO algorithm is capable of switching within both discovery and extraction by [28]

At each iteration, where denotes the present iteration and refers to the maximum number of iterations, varies arbitrarily between 0 and 1. Discovery happens when is greater than 0.5, whereas exploitation happens when is less than 0.5. Rising iteration decreases the fluctuation range of from (0, 1) to (0, 0.5), indicating an important change in likelihood for both the exploration and the exploitation phases, whereas growing iteration raises the probability of the discovery phase.

4.2.1. Exploration Phase

The BWO exploration phase is determined by analyzing beluga whales’ swimming activity. According to documented habits of beluga whales in human care, beluga whales may participate in social-sexual behaviors from a variety of positions, such as the coordinated or reversed pair swim portrayed in Figure 1. Thus, the precise positions of investigators are established by the tandem swim of beluga whales, and the geographic coordinates of beluga whales are altered to reflect this [28]: where represents the iteration quantity, indicates the new positioning of the th beluga whale in the th dimension, () is a number chosen at random representing the -dimension, and is the new positioning of the th beluga whale in the dimension. is the position of the th beluga whale on the dimension, and refer to the current coordinates of the th and th beluga whales ( is a beluga whale selected at random), and is the place of the th beluga whale on the dimension. and are arbitrary integers between 0 and 1, and the functions and show that the beluga whales’ flippers are facing upwards. The revised positioning reflects the coordinated or mirror-like swimming and diving behaviors of beluga whales depending on the dimension chosen via an odd and even quantity. Two random integers, and , are used to enhance randomized operators during the exploratory stage.

4.2.2. Exploitation Phase

The BWO exploiting phase is affected via beluga whales’ predatory tendencies. Beluga whales have the capability of coordinated eating and locomotion when other beluga whales are nearby. Therefore, beluga whales prey by exchanging information about positions that are open, while taking into consideration the best competitor and others as well. During the predatory period of BWO, the Levy flight [28] method is applied in order to increase convergence. We postulated that such creatures could secure their prey by employing the Levy flying tactics, and the associated framework is presented as follows [28]:

where is the present iteration, is the present location of the th beluga whale, is the current situation of an arbitrary beluga whale, is the most recent position of the th beluga whale, and is the present location of the best beluga whale. and are indeterminate values between (0 and 1), and is the randomized jump power that determines the Levy flight power.

The Levy flight formula is calculated in the following way [28]: where and are random quantities with a normal distribution and equates to the fixed 1.5.

4.2.3. Whale Fall

Beluga whales are threatened by predators such as killer whales, polar bears, and humans throughout passage and feeding. The majority of beluga whales are clever and are able to prevent peril by sharing information. Nonetheless, a few beluga whales passed away and fell into the ocean abyss. The phenomenon is referred to as “whale fall,” and it provides sustenance for an extensive variety of animals. Countless predators and invertebrates converge on whale corpses in search of sustenance, and the fractured skulls and corpses of dead whales drew an extensive amount of hairy crabs. The skeleton is gradually destroyed or inhabited for many years by microorganisms and algae [28].

To simulate the actions of whales falling during every iteration, we arbitrarily select the likelihood of whale decline from the individuals in the population to simulate minor differences in the sets. We believe that these beluga whales either moved to another spot or received shots and plunged into the depths of the sea after being wounded. In order to keep the identical amount of population, the current positions of beluga whales and the whale fatality step size are employed to figure out the revised position. This is how the model is presented as follows [28]:

where , , and are random integers ranging from 0 to 1 and is the step dimension of whale descent determined by [28]. where is the step element related to whale fatality and the size of the population () and and are the upper and lower variable bounds, respectively. The amount of steps is determined by the maximum number of scheduling variables and iterations.

This model estimates the likelihood of whale stranding () as a function that is linear [28].

The reality that the possibility of whale plummet dropped from 0.1 in the first iteration to 0.05 in the final iteration indicates that, as beluga whales become closer to sources of protein over the optimization process, their vulnerability reduces.

4.3. The BWO Procedure

Depending on the previous principle, BWO consists of three phases: the exploration phase, which simulates floating behavior; the predatory phase, which simulates killing behavior; and the whale collapse phase, which is modified by the beluga whale’s decline. Every time the optimization procedure is repeated, when the stages of exploration and extraction draw the conclusion, the whale decline phase begins to occur. The final section describes the principal BWO method.

Step 1 (initialization). Establish the BWO specifications, including the population amount and the maximum number of iterations . The primary locations of every beluga whale within the search space were chosen at random, and values for fitness can be calculated using the fitness.

Step 2 (update the exploration and discovery procedure). The equilibrium factor decides how much a beluga whale will go through the stage of exploration or utilization phase. If for a beluga whale is greater than 0.5, the revision method enters the searching phase, and the beluga whale’s position is updated. If is less than 0.5, the stage of exploitation governs the revisions, and the exact position of a beluga whale is updated. Taking this, the fitness ratings of the newly created positions are obtained and ordered to find the best one for the present iteration.

Step 3 (updates on the phase of whale lactation). Each iteration estimates the whale descent possibility . Multiple beluga whales may perish and sink to the ocean floor, and the whale descent probability is computed with each iteration. Consequently, update the location of a beluga whale.

Step 4 (verification of conditioned ending). The BWO ends if a specific iteration surpasses the maximum number of iterations. Optionally, repeat Step 2.

4.4. Overview of the Improved BWO (IBWO)

A nonlinearly diminishing inertia weight approach [29] is used to improve both the local and global exploratory results for conventional BWO. Variations in value impact the capability to search. From to , the declined in a nonlinear manner. Large values have been advantageous for locating global advances, whereas small values are suitable for locating regional breakthroughs. This approach is outlined by [29] where and are the utmost and smallest amounts, respectively. is the maximum number of iterations, and is a positive number ( [29]).

The info that follows has been modified:

4.5. The IBWO Implementation

Flowchart of the IBWO implementation to solve the problem is depicted in Figure 3. The steps of the problem implementation using the IBWO are as follows:

Step 1. The program provides details regarding the 33-bus distribution network, such as ohmic resistance and reactance values for network, active, and reactive demand; the lowest and highest ratings for PVs, WTs, and batteries; and the network’s tie-line quantity.

Step 2. Establishing the algorithm’s parameters, such as the size of population and maximal iteration of the IBWO, as well as the total amount of beluga whales.

Step 3. For the starting point of the algorithm, the variables consist of the location and size of the HMG system devices (the installation location of buses 2 to 33 and the maximum capacity of the number of PVs, WTs, and batteries 500, 500, and 3000, respectively) in addition to the network open switches (the number of 5 switches to be a variable among 37 network lines (plus tie-lines) chosen at random corresponding to the range of ).

Step 4. The decision variable sets for the algorithm population are found, randomly.

Step 5. The backward-forward power flow is done, and the value of the objective function (Eq. (11)) is computed for the variable set, taking into consideration the operational and HMG constraints (Eqs. (12)–(19)) along with the network radial status. This phase identifies the optimum variable set considering the objective function (Eq. (11)) value.

Step 6. Update the BWO population.

Step 7. The computation of the value of the objective function (Eq. (11)) per revised population in step by step 6, witnessing operation limitations the size of resources and batteries, and the condition to preserve the radial state of the network, and changing it with the previous set (step 5) if the new variables have better outcomes (better value be subject to the objective).

Step 8. In this stage, the traditional BWO population is updated based on the inertia weight method (IBWO).

Step 9. The objective function (Eq. (11)) value for each updated set is computed in step 8, and the value of the superior answer is substituted with the best variable value set from step 7.

Step 10. Evaluation of convergence requirements (under the condition of obtaining the best objective function (Eq. (11)) and performing the greatest number of algorithm iterations). If yes, proceed to step 11; if not, proceed to step 6.

Step 11. Terminate the procedure and print the optimal variable set, which includes the place of installation and size of the HMGs’ component as well as open network switches.

5. Simulation Results and Discussion

In this section, the results of the operation and reconfiguration of a 33- and 59-bus distribution networks with HMG multi-HMG operation and self-healing enhancement via the improved beluga whale optimization (BWO) algorithm based on the inertia weight method (IBWO) are presented. Figure 4 displays the network schematic for the 33-bus network. This network has 37 branches and 5 tie-lines, identified as lines 33, 34, 35, 36, and 37, with a total active demand of 3,720 kW and a reactive demand of 2,300 kVAr. Also, a real 59-bus distribution network is considered to implement the proposed methodology and is depicted in Figure 5. This network is a section of the southern Iranian city of Ahvaz’s distribution network. There are 63 branches, 5 tie-lines identified as lines 59, 60, 61, 62, and 63, and 58 sectionalizing switches in the 59-bus distribution network with 9,690 kW and 7,318.2 kVAr, respectively, represent the total active and reactive demands. The bus and line data of the real 59-bus network is presented in Table 2. The network loading data from Ref. [35] is displayed in Figure 6. In addition, meteorological data, such as solar radiation data, ambient temperature data, and wind speed data, were extracted based on Ref. [31] and presented in Figures 79. In addition, Table 3 provides data on numerous HMG equipment. To validate the IBWO solver, its efficacy in solving the operation problem was compared to that of the traditional BWO method particle swarm optimization (PSO) and ant lion optimizer (ALO). In all simulations, the size of population, maximum iteration number, and number of autonomous executions of each method are tuned to 50, 200, and 25, correspondingly. Moreover, the general and regulatory parameters of BWO, PSO, and ALO have been chosen as per each algorithm’s respective reference paper. The simulation of the recommended approach was performed in the MATLAB software using a desktop system with an Intel Core i7, 8 GB of memory, and a 1 TB hard disk drive.

For the purpose of assessing the efficacy of the proposed methodology, the following scenarios have been executed:

Scenario #1. Network operation based on scheduling of a HMG without SH.

Scenario #2. Network operation based on scheduling of two HMGs without SH.

Scenario #3. Network operation based on reconfiguration without SH.

Scenario #4. Network operation based on the scheduling of a HMG and reconfiguration without SH.

Scenario #5. Network operation based on scheduling of two HMGs and reconfiguration without SH.

Scenario #6. Network operation based on scheduling of two HMGs and reconfiguration with SH.

5.1. The Simulation Results without SH, 33-Bus Network
5.1.1. The Results of Scenario #1

The results of a 33-bus distribution network with the HMG scheduling without SH consideration using the IBWO algorithm are given. The efficacy of IBWO to solve the problem is compared to that of BWO, PSO, and ALO. Evidently, the IBWO procedure has attained the optimal solution with a faster convergence rate (Figure 10). On the other hand, it can be seen that enhancing the capability of the traditional BWO algorithm based on the inertial weight method improves its discovery achievement and prevents premature convergence to the extent that the enhanced version has achieved convergence in fewer convergence iterations than its traditional counterpart.

Table 4 displays the numerical outcomes of the operation of a 33-bus distribution network based on the scheduling of an HMG without consideration of SH via the IBWO. Based on backward-forward load flow, the ENS, SAIFI, and SAIDI values for the base network are obtained 1824.79 kWh, 53.93 MWh, 4.10, and 48.65, respectively. The IBWO has attained a lower objective function value (better performance) than the BWO, PSO, and ALO techniques. The IBWO method installed 2 PVs, 252 WTs, and 17 batteries in bus 33, as shown in Table 4. The energy losses, ENS, SAIFI, SAIDI, and HMG costs are 1275.12 kWh, 44.77 MWh, 2.06, 32.36, and 65,576.17 dollars, respectively. By obtaining lower values of energy losses, ENS, SAIFI, and SAIDI, the IBWO method has a better performance in network operation according to the scheduling of an HMG, as a consequence of reducing the energy of network subscribers, as determined by a comparison of the results of various methods. As a result of the HMG system’s regularly scheduled energy injection, the network’s dependability has been enhanced.

5.1.2. The Results of Scenario #2

The results of a 33-bus network with the scheduling of two HMGs without considering SH using the IBWO algorithm are given. The capability of the IBWO method to solve the problem is compared with the traditional algorithms of BWO, PSO, and ALO. As can be seen in Figure 11, the IBWO method has achieved the optimal solution with a higher convergence speed. On the other hand, it is clear that improving the performance of the traditional BWO algorithm based on the inertial weight method strengthens its discovery performance and prevents premature convergence in such a way that the improved version has achieved convergence in fewer repetitions of convergence compared to its traditional version.

The numerical results of the operation of a 33-bus distribution network based on the scheduling of two HMGs without considering SH using the IBWO are presented in Table 5. As can be seen, the IBWO method has achieved a lower objective function value compared to the BWO, PSO, and ALO methods. According to Table 5, the IBWO method installed one HMG with 1 PV, 180 WTs, and 75 batteries in bus 33 and another HMG in bus 15 with 284 PVs, 395 WTs, and 570 batteries. With the optimal scheduling of two HMGs, the amount of energy loss, ENS, SAIFI, SAIDI, and HMG cost is 963.06 kWh, 27.58 MWh, 2.75, 37.84, and $155,445.61, respectively. The comparison of the results of different methods showed that the IBWO method by achieving lower values of energy losses, ENS, SAIFI, and SAIDI has a better performance in network operation based on the scheduling of two HMGs, as it is caused by reducing the energy of network subscribers. In the planned energy injection of the microgrid system, it has also improved the reliability level of the network.

5.1.3. The Results of Scenario #3

In this section, the IBWO algorithm-based operation results of a 33-bus distribution network based on reconfiguration are presented without considering SH. The efficacy of IBWO in solving the problem was compared to that of BWO, PSO, and ALO. All optimization techniques have converged on the optimal value according to Figure 12. The IBWO method, on the other hand, has obtained the optimum solution with the more convergence rate and faster convergence iteration than other methods.

In addition, Table 6 presents the numerical results of the operation of the 33-bus network based on reconfiguration without consideration of SH using various algorithms. As can be seen, the energy losses, ENS, and SAIFI values for each method are 1283.77 kWh, 43.84 MWh, 3.38, and 42.89, respectively. In the reconfiguration problem, the IBWO method has obtained the configuration of the network optimally, by opening switches 7, 10, 14, 28, and 32.

5.1.4. The Results of Scenario #4

Using the IBWO, the outcomes of operating a 33-bus network according to the scheduling of an HMG and network reconfiguration without taking into account SH are presented in this section. The efficacy of IBWO to solve the problem is contrasted to that of BWO, PSO, and ALO. Evidently, the IBWO procedure has attained the optimal solution with a faster convergence rate (Figure 13). On the other hand, it can be noticed that enhancing the traditional BWO performance relying on the inertial weight approach improves its discovery profitability and hinders premature convergence, such that the improved version reached convergence in fewer convergence iterations than the conventional version.

Table 7 gives the numerical outcomes of the operation of a 33-bus distribution network determined by the scheduling of an HMG with network reconfiguration and disregarding SH with the IBWO. The IBWO identifies the optimum configuration by opening switches 7, 10, 14, 16, and 28 and taking into account the place of installation of the HMG in bus 17 so that the number of PVs, WTs, and batteries is correspondingly 12, 156, and 80. Energy losses, ENS, SAIFI, SAIDI, and HMG expenses are 1150.46 kWh, 37.94 MWh, 2.07, 32.42, and 42,019.63 dollars, respectively, based on the IBWO method’s determination of the decision variables. The results gathered by various methods indicate that each method succeeded in creating an optimal network configuration that is distinct from the others and has also provided the implementation location and various capacities of the HMG. As with previous comparisons, the results demonstrate the superior performance of the IBWO method in achieving multiple objectives, such as decreasing energy losses and increasing reliability metrics.

Figure 14 depicts the variations in the generated power of PVs and WTs, in addition to the planned power injection by HMG into the 33-bus network. The HMG, which depends on the management of battery storage charge and discharge, proved enabled to inject continuous and predetermined power into the distribution network. The battery storage system stores extra power to satisfy the load’s requirements and releases the stored reserve energy in moments of power deficit from renewable resources in order to reliably supply the demand.

Figures 15 and 16 depict the variations in network power loss and ENS before and after HMG scheduling and network reconfiguration over the course of 24 hours. As demonstrated in scenario 4, network power losses, particularly peak load, have dropped based on the planned injection of HMG power, network reconfiguration, and load flow path modifications, from 1824.79 kWh to 1150.46 kWh in the base network. Also, in Figure 16, the customer energy not-supplied is decreased during all hours, which is a result of battery storage power management in the HMG system. As a result, the network’s reliability has increased, and the value of ENS has decreased from 53.93 MWh to 37.9 MWh.

Figure 17 depicts the voltage profile curve of the 33-bus network before and after scheduling an HMG and network reconfiguration. It is evident that after resolving the scheduling problem, the network voltage deviations decreased, resulting in an enhanced profile of voltages.

5.1.5. The Results of Scenario #5

The outcomes of the network operation based on the scheduling of two HMGs and network reconfiguration are given without considering SH using the IBWO algorithm. The IBWO performance is compared with BWO, PSO, and ALO. In Figure 18, it is clear in this scenario that the IBWO has reached the convergence and optimal solution sooner than other methods and has achieved the lower objective function value.

The scheduling results of two HMGs and network reconfiguration are presented without considering SH using the IBWO algorithm in Table 8. The IBWO method determines the best network configuration by opening switches 7, 10, 14, 16, and 28 and determines the site of the first HMG in bus 33 such that the number of PVs, WTs, and batteries is 14, 174, and 22, respectively, and the location. The installation of the second HMG is determined in bus 17, as the PV, WT, and battery numbers are determined as 149, 381, and 570, respectively. Based on the decision variables determined by the IBWO, the energy losses, ENS, SAIFI, SAIDI, and HMG cost are obtained at 613.29 kWh, 24.81 MWh, 2.04, 32.30, and $148,625.48, respectively. The results obtained from different methods show that each of the methods has achieved an optimal network configuration different from the other and also provided the installation location and different capacities of the HMGs. The results of proposed methodology based on the hybrid multi-microgrid allocation and network reconfiguration are demonstrated that the losses, ENS, SAIDI, and SAIFI are reduced by 66.39%, 54.00%, 50.24%, and 33.61%, respectively, for 33-bus network in comparison with the base network. The comparison of the results, like the previous scenarios, shows the better performance of the IBWO method in further improving various goals, including reducing energy losses and improving reliability indicators.

In Figure 19, the power variation curve of PV and WT sources, as well as the injected power of HMG related to both HMGs to the network, is depicted. The HMG system with battery storage charge and discharge management has been able to inject continuous and planned power into the distribution network. The battery storage system stores excess power over the load’s needs and discharges the stored energy to supply the network load in times of power shortage of renewable resources to supply the load with a high level of resilience.

In Figures 20 and 21, the curve of changes in network power losses as well as changes in ENS is shown before and after the scheduling of two HMGs and network reconfiguration during 24 hours. In scenario 5, in all hours, network power losses, especially peak load, based on the planned injection of HMG power, as well as network reconfiguration and network power flow path changes, have declined from 1824.79 kWh, energy loss in the base network to 613.29 kWh. Also, in Figure 21, the ENS of the network subscribers has decreased in all hours, which is an effective problem of battery reserve power management in the HMG system, thus enhancing the reliability of the network and reducing the value of ENS from 53.93 MWh to 24.81 MWh.

Figure 22 also shows the voltage profile curve of the 33-bus network before and after the scheduling of two HMGs and the network reconfiguration, which is found to have improved significantly network voltage profile.

5.1.6. The Results of Scenario Comparison, 33-Bus Network

This section compares the efficacy of various scenarios in Table 9. The scenario with the lowest value of the objective function (see Figure 23), as well as the quantity of energy loss, ENS, SAIFI, and SAIDI, has the greatest efficiency, as can be seen in scenario 5. Scenario 5 is able to further enhance the network’s efficiency by identifying the optimal configuration of the 33-bus network by opening switches 7, 10, 14, 16, and 28 and placing two HMGs in buses 33 and 17. Scenario 3 with network reconfiguration has seen the least improvement over time. Upon analyzing the results, it is determined that the incorporation of network reconfiguration with HMG or HMG scheduling (comparing scenarios 1 and 4 and scenarios 2 and 5) enhanced each of the objectives.

5.2. The Simulation Results with SH
5.2.1. The Simulation Results with SH for 33-Bus Network

The numerical results of the operation of a 33-bus distribution network based on two HMG scheduling and the network reconfiguration are given considering SH (scenario 6) using the IBWO algorithm in Table 10. The performance of scenario 6 in SH conditions with the occurrence of a fault in lines 18, 22, and 25 of the network in hour 1:00 of simulation has been investigated. The results demonstrated that in the event of a fault in any of the lines, during 24 hours, disconnecting and connecting the network switches to obtain the optimum configuration of the network and also the scheduling of HMGs was done in such a way that in addition to minimizing network energy losses and the cost of energy injection of HMGs into the network, resilience indicators such as ENS, SAIFI, and SAIDI are minimized to provide better self-healing. According to Table 10, it is observed that in the event of a fault in each of lines 18, 22, and 25 of the network, the recommended method integrates the optimal scheduling of HMGs well by determining the optimal configuration of the network with the open and closed switches of the network, and thus, it has improved reliability and self-healing. Also, the results demonstrated that the costs of HMG energy generation and power injection to the network have increased compared to the conditions before the fault occurred in different lines.

The percentage changes of each of the goals compared to the base value in scenario 6, considering SH per fault occurrence in different network lines, are shown in Figures 2427. Based on Figures 24 and 25, the highest deviation of energy losses and ENS is related to the fault occurrence in line 18 and the lowest value is related to line 25. Also, according to Figures 26 and 27, the highest deviation of SAIFI and SAIDI is related to the occurrence of fault in line 22 and its lowest value is related to line 25. In comparison to scenario 5 without the line outages, the findings revealed that the network loss increased by 82.28% ((1117.93-613.29)/613.29100) and 2.15% ((626.49-613.29)/613.29100)), respectively, when lines 18 and 25 are faulted. Furthermore, when lines are unavailable, the ENS, SAIFI, and SAIDI increased by 26.45%, 56.86%, and 24.06% and by 0.75%, 9.80%, and 4.52%, respectively, when compared to scenario 5 without line outages.

5.2.2. The Simulation Results with SH for Real 59-Bus Network

The outcomes of applying the IBWO algorithm to a 59-bus distribution network with HMG scheduling and no SH consideration are provided. Convergence process of IBWO for 59-bus network to solve the scenario 5 using the IBWO is depicted in Figure 28. The numerical results of the implementation of scenario 5 on the 59-bus network using the IBWO algorithm are given in Table 11. It can be seen that with the optimal allocation and scheduling of two HMGs in buses 33 and 28 of the network and by opening lines 19, 29, 32, 53, and 62, the power loss has decreased from 1,651.23 kW to 573.12 kW. Also, the ENS, SAIFI, and SAIDI reliability indices are obtained 147.320 MWh, 4.49 failure/customer/yr, and 32.30 hour/customer/yr, respectively, which are significantly improved. Therefore, using two HMGs has reduced power losses, ENS, SAIFI, and SAIDI by 65.29%, 57.44%, 48.63%, and 62.33%, respectively, in comparison with the basic network without reconfiguration and also HMG allocation. The results are given that the losses, ENS, SAIDI, and SAIFI are declined by 65.29%, 57.44%, 48.63%, and 62.33%, respectively, for the real 59-bus Ahvaz network in comparison with the base network.

The power variations of the PV and WT sources, along with the injected power of the HMG associated with both HMGs to the 59-bus network for scenario 5, are shown in Figure 29. Constant and scheduled power injection into the distribution network has been made possible by the HMG system with battery storage charge and discharge management. When there is a power deficit of renewable resources, the battery storage system releases its stored energy to supply the network load with a high degree of reliability. It also stores excess power beyond the needs of the load.

Before and after the scheduling of two HMGs and network reconfiguration over a 24 hours period, the curves of changes in network power losses and ENS are depicted in Figures 30 and 31, respectively. The power losses have been reduced from 1651.23 kWh to 573.12 kWh in scenario 5. This reduction is the result of the intended injection of HMG power, network reconfiguration, and changes in the power flow path of the network. Additionally, the ENS of the network subscribers has exhibited a consistent decrease throughout the day, as depicted in Figure 31. This diminishing value of ENS from 346.178 MWh to 147.320 MWh effectively addresses an issue with battery reserve power management in the HMG system, thereby bolstering the network’s reliability.

The numerical results of the 59-bus network’s operation in accordance with HMG scheduling and network reconfiguration (scenario 6) taking into account the SH via the IBWO are presented in Table 12. The efficiency of scenario 6 under SH conditions, including disruptions on lines 12 and 14, was assessed during hour 1:00 of the simulations. The findings indicated that, should a malfunction occur in these critical lines, the process of reconnecting and disabling network switches to attain the most efficient network configuration, in conjunction with HMG scheduling, reduces network energy losses and expenses associated with HMG energy injection. This, in turn, aids in the enhancement of self-healing capabilities by decreasing reliability metrics including ENS, SAIFI, and SAIDI. The proposed method integrates the optimal scheduling of HMG, as shown in Table 12. This is achieved by determining the optimal network configuration using the open and closed switches of the network. As a result, the proposed method ensures improved reliability and self-healing capabilities in the event that a fault occurs in lines 12 and 14. Furthermore, the findings unveiled that the expenses associated with microgrids, energy generation, and power injection into the grid have escalated in comparison to the conditions that prevailed prior to the occurrence of multiple line faults.

The results showed that with the outage of lines 12 and 14, respectively, the network loss increased by 52.32% ((872.97-573.12)/573.12100) and 77.59% ((1017.83-573.12)/573.12100) compared to the scenario 5 without the outage of lines. Moreover, considering the outage of line 12, the ENS, SAIFI, and SAIDI are increased 10.30%, 32.29%, and 79.66%, and also considering the outage of line 14, these objectives are increased by 8.40%, 3.12%, and 18.05%, respectively, compared with the scenario 5 without any outages (see Figures 3235). By examining the results presented in Table 12 and Figures 3235, it can be seen that the network loss with the outage of line 14 is higher compared to the condition of the outage of line 12. On the other hand, the results confirm that the outage of line 12 has further weakened the network reliability compared with the outage of line 14.

6. Conclusion

This study proposed the 33- and 59-bus distribution network operation by employing simultaneous scheduling of multi-HMGs integrated with a reconfiguration for reliability improvement considering self-healing in fault occurrence in the network lines for minimizing the energy losses, cost of the multi-HMGs, ENS, SAIDI, and SAIFI indices during 24 hours of the study horizon. The IBWO was applied to find the decision variable to minimize the multi-objective function and satisfy the operational and multi-HMG constraints. Seven scenarios were considered to evaluate the effectiveness of the proposed method including scheduling of one microgrid, two microgrids, network reconfiguration, simultaneous scheduling of one HMG with reconfiguration, and simultaneous scheduling of two HMGs with reconfiguration, and also, the last two scenarios were implemented along with self-healing. The findings of the study were summarized as follows: (i)The simulation results showed that the scheduling scenario of two microgrids with reconfiguration in the condition without self-healing had the highest performance improvement. In other words, the greatest reduction in energy losses and reliability indicators is related to this scenario, and the weakest performance was related to the reconfiguration-only scenario(ii)The results of HMG scheduling showed that the battery storage system, by compensating the power fluctuations of renewable energy sources with charge and discharge energy management, was able to inject programmable power into the distribution network, thereby improving the network performance and reliability indices(iii)The simulation results have confirmed that by optimally changing the status of network switches in the event of a fault, the network can be self-healing, and with optimal HMG scheduling, various network objectives, especially resilience, had improved significantly compared to the basic network(iv)The results demonstrated the superiority of the proposed IBWO compared to other algorithms and had led to lower energy losses and higher reliability improvement. It was also found that improving the capability of the conventional BWO with the nonlinearly diminishing inertia weight approach had improved its exploration power and increased the speed and accuracy of its convergence in reaching the optimal global solution(v)The findings indicated that self-healing is achieved in the event of network line outages through the concurrent implementation of reconfiguration, allocation, and optimal scheduling of HMGs in the distribution network. As a result, reliability indices have improved while energy losses and the cost of injecting energy into the network via HMGs have been reduced(vi)The findings from the suggested approach, which combines hybrid multi-microgrid placement and network reconfiguration, show significant improvements, specifically, losses, ENS, SAIDI, and SAIFI decreased by 66.39%, 54.00%, 50.24%, and 33.61%, respectively, for a 33-bus network, and saw reductions of 65.29%, 57.44%, 48.63%, and 62.33%, respectively, for the actual 59-bus Ahvaz network when compared to the base network(vii)The results showed that with the outage of lines 12 and 14 of the 33-bus network in scenario 5, respectively, the network loss is increased by 82.28% and 2.15%, the ENS is increased by 26.45% and 0.75%, the SAIFI is increased by 56.86% and 9.80%, and the SAIDI is raised by 24.06% and 4.52% compared with the scenario 5 without any outages(viii)The results showed that with the outage of lines 12 and 14 of the real 59-bus network in scenario 5, respectively, the network loss is increased by 52.32% and 77.59%, the ENS is increased by 10.30% and 8.40%, the SAIFI is increased by 32.29% and 3.12%, and the SAIDI is raised by 79.66% and 18.05% compared with the scenario 5 without any outages(ix)Distribution network operation based on multi-microgrids and multi-storage scheduling and reconfiguration to enhance the reliability considering self-healing incorporating uncertainty is suggested for future work

Nomenclature

:Purchase cost of each battery
:Annual maintenance cost of batteries
:Purchase cost of each inverter
:Annual maintenance and operation cost
:Purchase cost of each PV
:Annual maintenance cost of PV
:Current passing through the line
:Upper current passing through the line
:Purchase cost of each WT
:Annual maintenance cost of WT
:Duration of line repair
:Depth of discharge
:Battery energy values at hours
:Lower and upper energy limit of the battery
:Total network energy not-supplied
:Length of line
:Number of subscribers at load point
:Number of batteries
:Inverter efficiency
:Number of lost loads due to line outage
:Net present cost of the HMG
:Number of PVs
:Minimum and upper number of PVs
:Minimum and upper number of WTs
:Number of WTs
:Battery power injected to the inverter
:Active load of the network
:Active load of the network
:Active power transferred from the hybrid system into the grid
:Transferred power from the inverter to the load
:Total active power loss
:The network load power
:Active post power
:Power of PV
:Total power of PV
:Rated power of PV
:Renewable energy sources power transmitted to the inverter
:Power of WT
:Total power of WT
:Rated power of WT
:Reactive load of the network
:Reactive power transferred from the hybrid system into the grid
:Reactive post power
:Ohmic resistance of the line
:Rate of line outage
:System average interruption duration index
:System average interruption frequency index
:Temperature of the PV cell
:Temperature of the PV in the reference condition
:Voltage of buses
:Voltage of buses
:Upper value of the bus voltage
:Lower value of the bus voltage
:Whale stranding
:Wind speed
:Cut-in wind speed
:Cut-out wind speed
:Rated wind speed
:Step dimension of whale descent
:Resent location of the th beluga whale
:New positioning of the th beluga whale in the th dimension
:Current coordinates of the th beluga whales
:Current situation of an arbitrary beluga whale
:Current coordinates of the th beluga whales
:Weighting coefficient
:Self-discharge
:Failure rate of load points
:Battery charging yield
:Lost load due to line outage
:Radiation perpendicular to the PV surface
:Standard test condition radiation
:Temperature coefficient of the PV panel.

Data Availability

The data applied to support the research outcomes are given within the paper (Table 3) and also Ref. [31].

Conflicts of Interest

The authors declare that they have no conflicts of interest.

Authors’ Contributions

Alireza Kalantari was responsible for the conceptualization, methodology, and software and wrote the original draft. Hamid Lesani was responsible for the supervision, investigation, and validation and wrote, reviewed, and edited the manuscript.